Pushing the potential

From transmission lines and highways, to substations and switching stations, we’ve taken on projects of all kinds. Whether we’re lending our engineering expertise, or managing an entire build, we navigate even the most complex logistical challenges with ease.

Marystown Salmon Hatchery
2018 (estimated)
Grieg NL Seafarms Ltd has chosen Marystown, NL to locate a new, state-of-the art, land-based salmon hatchery and growth facility. This facility, when fully
Marystown Water Street East
2017

This roadway project consisted of replacement of the water, sanitary sewer and storm sewer systems, as well as all new pavement along the entire street.

East Calgary Landfill Administrative Building
2015
Built as an upgrade to East Calgary Landfill’s staff facilities, this 32-unit modular complex was equipped with fully functioning HVAC, natural gas, sanitary,
Highway 680 & Highway 727
2014
This Alberta Transportation project consisted of 14.6 km of base and paving on Highway 680:02 and 18.4 km of final stage paving on Highway 727:02. Reconstruction of
Bowmanton 244S Substation Expansion
2014
Located northwest of Medicine Hat, Bowmanton 244S is a substation that switches from 138 kV to 240 kV. CAP constructed the 240-kV side of the substation. The work
Red Chris 287-kV Transmission Line
2014
Together with our partners, CAP installed 263 self-supporting and guyed steel lattice towers for this project. This transmission line spans 95 km of isolated
Foothills 237S Substation
2014
This greenfield project involved stripping topsoil and constructing a substation pad. This included installing 336 screw piles, 4 breaker pads, 2 transformer pads
Johnson 281S Site Prep and Foundations
2014
The Johnson 281S Substation is a new 240-kV/138-kV switching station located west of Didsbury. This substation required 1.5 km of transmission line to connect it to
High River & Okotoks Substations
2014
This project involved the expansion of High River’s and Okotoks’ substations. For the Okotoks substation, 11 concrete pile foundations and 1 circuit breaker pad
Black Spruce 154S Site Grading
2013
The Black Spruce 154S Substation is a new 240-kV switching station located 35 km south of Conklin, Alberta, on the Cenovus Christina Lake Project Site. This
SaskPower I1K Transmission Line
2013
At 230-kV and 300 km long, the I1K Transmission Line runs from Island Falls to Key Lake in northern Saskatchewan. This project involved foundation construction, the
NE Loop Transmission Line
2012
The NE Loop project responded to the need for a comprehensive transmission circuit to supply the Husky Oil Sands project. It eventually brought power to the Kearl
Ross River Road and Drainage Upgrades
2012
Situated on the south bank of the Pelly River, Ross River is a small community in east-central Yukon. Cyclical spring thaws and ice jams caused Pelly River to flood
Shakwak Highway Quality & Quantity Control
2012
The Government of Yukon required quality and quantity control services for two warm mix asphalt pavement (WMAP) projects on Shakwak Highway. CAP monitored and
Forrest Kerr Hydroelectric Survey
2011
Located in British Columbia, 1,000 km northwest of Vancouver, Forrest Kerr is a 195-MW run-of-river hydroelectric project. This facility captures the immense energy
Whistle Bend Way & Mountainview Drive
2011
Located in Whitehorse, Yukon, Whistle Bend is a seven-phase mixed residential, commercial, and institutional development that features wide green corridors
Kearl Lake Transmission Line Survey
2010
The Kearl Lake project involved the construction of a 71-km transmission line anchored by a 240-kV substation. First, our partners excavated and graded the site,