Project Details

Built as an upgrade to East Calgary Landfill’s staff facilities, this 32-unit modular complex was equipped with fully functioning HVAC, natural gas, sanitary, potable water, and electrical systems. The building was also enhanced with a new wash bay for garbage trucks.

CAP’s Role

CAP landed the trailers and completed utility interconnects for this project. Our management team oversaw our carpenters, plumbers, and subcontractors as they constructed the building. We procured all material for the utility interconnects and natural gas line.

To ensure consistent communication between our subcontractors and the client, we provided daily progress reports and attended weekly construction meetings. Through thorough planning and proactive measures, CAP overcame multiple obstacles during construction. We resolved issues with unfinished unit interiors, IFC drawing changes, and missing materials.

Project Statistics

Year Completed: 2015
Our Services: Project Management | Pre-Engineered Buildings
Project Location: Calgary, AB

Similar Projects

Marystown Salmon Hatchery
2018 (estimated)
Grieg NL Seafarms Ltd has chosen Marystown, NL to locate a new, state-of-the art, land-based salmon hatchery and growth facility. This facility, when fully
Marystown Water Street East
2017

This roadway project consisted of replacement of the water, sanitary sewer and storm sewer systems, as well as all new pavement along the entire street.

Shakwak Highway Quality & Quantity Control
2012
The Government of Yukon required quality and quantity control services for two warm mix asphalt pavement (WMAP) projects on Shakwak Highway. CAP monitored and
Ross River Road and Drainage Upgrades
2012
Situated on the south bank of the Pelly River, Ross River is a small community in east-central Yukon. Cyclical spring thaws and ice jams caused Pelly River to flood