Project Details

The NE Loop project responded to the need for a comprehensive transmission circuit to supply the Husky Oil Sands project. It eventually brought power to the Kearl Oil Sands projects. To develop the NE Loop, over 100 km of a single circuit 240-kV transmission line was constructed. This was completed with 5 greenfield substations and the retrofit of 1 brownfield substation.

CAP’s Role

CAP provided project management, surveying, inspection, and quality assurance and control services for the transmission line and substations. For the survey component, we conducted layout and as-built surveys (completed with drafting) for the foundations of the 240-kV transmission towers.

Project Statistics

Year Completed: 2012
Our Services: Project Management | Field Engineering | Pda Analysis | Survey & Geomatics
Project Location: Fort McMurray, AB

Similar Projects

Marystown Salmon Hatchery
2018 (estimated)
Grieg NL Seafarms Ltd has chosen Marystown, NL to locate a new, state-of-the art, land-based salmon hatchery and growth facility. This facility, when fully
Marystown Water Street East
2017

This roadway project consisted of replacement of the water, sanitary sewer and storm sewer systems, as well as all new pavement along the entire street.

Shakwak Highway Quality & Quantity Control
2012
The Government of Yukon required quality and quantity control services for two warm mix asphalt pavement (WMAP) projects on Shakwak Highway. CAP monitored and
Ross River Road and Drainage Upgrades
2012
Situated on the south bank of the Pelly River, Ross River is a small community in east-central Yukon. Cyclical spring thaws and ice jams caused Pelly River to flood