NE Loop Transmission Line

The NE Loop project responded to the need for a comprehensive transmission circuit to supply the Husky Oil Sands project. It eventually brought power to the Kearl Oil Sands projects. To develop the NE Loop, over 100 km of a single circuit 240-kV transmission line was constructed. This was completed with 5 greenfield substations and the retrofit of 1 brownfield substation.