Highway 831

Located south of Boyle, this Alberta Transportation project includes pavement rehabilitation and safety improvements on 30 km of Highway 831:10. The pavement rehabilitation includes subgrade excavation, full width cold milling and paving to maintain the existing roadway width. Geometric improvements to six intersections are proposed, including construction of two service roads. Other work includes sideslope

Read More »

Highway 64

This Alberta Transportation project included pavement rehabilitation of 17.85 km of Highway 64:02 from the British Columbia border to 6 km east of Highway 717, as well as a safety rest area at km 1.4. The pavement rehabilitation included subgrade excavation, mill and fill transverse crack repair, spray patch, and an asphalt overlay. Other work

Read More »

Marystown Water Street East

This roadway project consisted of replacement of the water, sanitary sewer and storm sewer systems, as well as all new pavement along the entire street. The replacement of these systems will provide citizens with a more reliable water and sewer system. CAP’S ROLE We provided project engineering and project management services for this project, from

Read More »

Shakwak Highway

The Government of Yukon required quality and quantity control services for two warm mix asphalt pavement (WMAP) projects on Shakwak Highway. CAP monitored and advised on the sub-cut excavations, granular “A” and shoulder aggregate placement, asphalt tack, prime coat, and warm mix asphalt. In total, the contractor placed 56,500 tonnes of WMAP for the two projects.

Read More »

Ross River Road and Drainage Upgrades

Situated on the south bank of the Pelly River, Ross River is a small community in east-central Yukon. Cyclical spring thaws and ice jams caused Pelly River to flood into Ross River’s low-lying areas. The floods contributed to higher road maintenance costs, broken road BST surfacing, and surface water pooling within ditches and low areas. Local First Nation and territorial governments requested a road network re-design and re-construction to resolve these long-standing roadwork and drainage issues.

Read More »

East Calgary Landfill Administrative Building

Built as an upgrade to East Calgary Landfill’s staff facilities, this 32-unit modular complex was equipped with fully functioning HVAC, natural gas, sanitary, potable water, and electrical systems. The building was also enhanced with a new wash bay for garbage trucks.

Read More »

Black Spruce 154S Site Grading

The Black Spruce 154S Substation is a new 240-kV switching station located 35 km south of Conklin, Alberta, on the Cenovus Christina Lake Project Site. This substation provides reliable power to the oil industry in that region. Site preparation, grading, and an access road were necessary for this project.

Read More »

Foothills 237S Substation

This greenfield project involved stripping topsoil and constructing a substation pad. This included installing 336 screw piles, 4 breaker pads, 2 transformer pads with Sorbweb oil containment, and constructing the substation access road. Finally, the site was remediated by placing topsoil and grass seeding.

Read More »